Cbs-scientific QNX-700 Manuel d'utilisateur Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
8
Quadra Instructions 9-30-13
SECTION 3
Instructions for Slab Gel Electrophoresis Using Pre-Cast Gels
3.1 Preparing the Electrophoresis Unit
1. Power leads are shipped separately and
must be attached before using your
Quadra. Thread the power lead ends into
the lid receptacles and rotate in clockwise
direction to hand tighten.
2. Place unit in authorized work area. Remove
safety cover from the assembled unit by
simultaneously pressing down on white push
pins while lifting up on blue safety cover as
shown in gure 1.
Do not remove safety cover by pulling up
on leads!
3. Remove white core from lower reservoir
by grasping core with one hand and lifting
directly up as shown in gure 2. Remove
second core in same manner.
4. Open doors on the core assemblies by
pulling up on the white latches, as shown in
gure 3.
3
1
2
Vue de la page 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Commentaires sur ces manuels

Pas de commentaire